Image: TEK Precision inspection station: a blue rolling inspection cart holding a machined aluminium bracket fixtured on a black granite-style checking fixture, with an indicator stand alongside, and a lower shelf laid out with pin gauges, plug gauges, gauge blocks and cylindrical setting standards (https://tekprecision.com/assets/inspection-station-Cb9Uo3Gs.webp)

All Articles (https://tekprecision.com/blog)

Quality

# First-Article Inspection: What Buyers Should Actually Expect

TEK Precision August 6, 2026 7 min read

An FAI is not a dimensional report. It is evidence that a production process — not a one-off part — will reliably produce conforming hardware.

First-article inspection is one of the most commonly misunderstood requirements in aerospace procurement. It is frequently treated as a dimensional report on the first part off the line. It isn't. An FAI is evidence that the _process_ used to make that part will reliably produce conforming hardware for the duration of the programme.

The distinction matters. A part can be brought into conformance by hand-fitting, selective assembly or rework and pass a dimensional check. The FAI exists to demonstrate that no such intervention was needed.

## What a complete package contains

**A ballooned drawing.** Every dimension, note, tolerance and specification callout on the engineering drawing is numbered. Nothing is exempt — not surface finish notes, not material callouts, not process specifications, not marking requirements.

**A characteristic-by-characteristic report.** Each ballooned characteristic is recorded with its specified value, its actual measured value, and the method or gauge used. Missing entries are the most common deficiency in submitted FAI packages.

**Material certification.** Full traceability from the raw stock to the finished part, tying the material to its certificate and the certificate to the heat or lot. Our material traceability guide (https://tekprecision.com/blog/aerospace-material-traceability-buyers-guide) explains how the full document trail fits together.

**Special process certification.** Every process the drawing invokes — heat treatment, plating, bonding, etch inspection, stress relief — with evidence the source was approved for it and the process ran within specification.

**Functional and acceptance test data** where the drawing requires it.

**A record of the production configuration** used: which machines, which tooling, which programme revision, which operators. This is the part that makes the FAI about the process rather than the part.

The industry-standard format for organising this is AS9102, which defines the forms and content structure. TEK performs first-article inspection to AS9102 format. It is worth being precise about what that means: AS9102 is a _reporting standard_, not a certification. Suppliers work to it; nobody is certified in it.

## The measurement question

An FAI is only as credible as the measurements in it, which makes the metrology behind it worth examining.

Dimensional characteristics on complex geometry generally require a coordinate measuring machine. TEK's inspection lab operates a Brown and Sharpe CMM Model 7.6.3 Excel with a 42 by 42 by 18 inch envelope, supported by Mitutoyo 12-inch height masters accurate to 0.00002 inches, indicator micrometers reading to 0.0001, and lab-grade surface plates for datum establishment — three Ottavino plates at 3 by 6 feet and two Starrett pink plates.

Threaded features need dedicated gauging. TEK operates a complete Johnson thread gaging system covering #10 through 2.500, qualified for Method "C" and safety-critical thread inspection, backed by more than 300 thread plug gauges and more than 300 thread ring gauges from 4-40 through 7.000, each with a matched setting plug.

Every one of these instruments is on a documented calibration schedule traceable to NIST. An uncalibrated gauge produces a number, not a measurement — and an FAI built on uncalibrated data is worthless regardless of how complete the paperwork looks.

## Independence

There is a structural question buyers should ask that has nothing to do with equipment: **who can overrule the inspector?**

If quality reports through operations, there is pressure — sometimes explicit, more often ambient — to accept marginal conditions when a shipment is due. If quality reports independently, the inspector can reject without a conflict of interest.

TEK's quality organisation reports directly to leadership, with a Director of Quality above a Quality Control Manager and Chief Inspector, and independent authority over source inspection, in-process inspection, calibration of measuring and test equipment, first-piece inspection and facility surveys.

That structure is more predictive of long-term supplier performance than any single piece of inspection equipment.

## When FAI must be repeated

A common gap in supplier management. FAI is not once-and-done. It must be repeated when:

- The drawing or specification is revised
- Manufacturing moves to a different machine, facility or location
- A special process source changes
- Tooling is replaced or significantly modified
- Production lapses for an extended period — typically two years
- A previous FAI is found to be deficient

Each condition represents a change to the process the original FAI validated. TEK performs 100% first-article inspection on new part numbers.

## What to ask a supplier

- Is FAI performed on 100% of new part numbers, or sampled?
- Which characteristics are CMM-verified versus hand-gauged?
- Is calibration traceable to NIST, and can the certificates be produced?
- Does the quality organisation report independently of operations?
- What triggers a re-FAI, and how is that tracked?
- Are special process certifications included in the package or referenced?

**Related capabilities:** Inspection and test equipment (https://tekprecision.com/quality#inspection-lab) · Quality system approvals (https://tekprecision.com/quality#approvals) · Flight safety components (https://tekprecision.com/products#flight-safety-components)

_TEK Precision performs 100% first-article inspection on new part numbers under an independently audited quality management system. Request our quality documentation (https://tekprecision.com/contact)._

TP

Written by

TEK Precision

Related Articles

## More from Quality

Quality

### Full Material Traceability: From Mill Cert to Shipped Flight Part

October 9, 2026
https://tekprecision.com/blog/aerospace-material-traceability-buyers-guide

Quality

### Calibration and Temperature Control: Keeping Measurements True Through Winter

October 9, 2026
https://tekprecision.com/blog/aerospace-calibration-temperature-control

Quality

### Rockwell, Brinell, Vickers or Microhardness: Choosing the Right Test

September 30, 2026
https://tekprecision.com/blog/hardness-testing-methods-aerospace-parts

## Structured data

```json
[
  {
    "@context": "https://schema.org",
    "@graph": [
      {
        "@type": "Organization",
        "@id": "https://tekprecision.com/#organization",
        "name": "TEK Precision Co., Ltd.",
        "alternateName": "TEK Precision",
        "url": "https://tekprecision.com/",
        "logo": {
          "@type": "ImageObject",
          "url": "https://tekprecision.com/brand/tek-logo.webp"
        },
        "foundingDate": "1968",
        "description": "Precision aerospace manufacturer of flight safety-critical components, hydraulic assemblies and mechanical assemblies for rotorcraft and fixed-wing platforms.",
        "email": "teksales@tekprecision.com",
        "telephone": "+1-631-242-0330",
        "address": {
          "@type": "PostalAddress",
          "streetAddress": "205 West Industry Court",
          "addressLocality": "Deer Park",
          "addressRegion": "NY",
          "postalCode": "11729",
          "addressCountry": "US"
        },
        "sameAs": [
          "https://www.linkedin.com/company/tek-precision/"
        ],
        "hasCredential": {
          "@type": "EducationalOccupationalCredential",
          "credentialCategory": "certification",
          "name": "AS9100D / ISO 9001:2015",
          "identifier": "275724",
          "description": "AS9100D / ISO 9001:2015 certified. Certified scope: Machining and Assembly of Rotary Head and Fixed Wing Components for the Aerospace Industry.",
          "recognizedBy": {
            "@type": "Organization",
            "name": "Amtivo (USA) Inc."
          },
          "validFrom": "2026-09-11",
          "expires": "2029-09-10"
        }
      },
      {
        "@type": "WebSite",
        "@id": "https://tekprecision.com/#website",
        "url": "https://tekprecision.com/",
        "name": "TEK Precision",
        "publisher": {
          "@id": "https://tekprecision.com/#organization"
        },
        "inLanguage": "en-US"
      }
    ]
  },
  {
    "@context": "https://schema.org",
    "@type": "Article",
    "@id": "https://tekprecision.com/blog/first-article-inspection-flight-critical-hardware#article",
    "headline": "First-Article Inspection: What Buyers Should Actually Expect",
    "description": "First-article inspection verifies that a manufacturing process produces conforming hardware. Here's what a complete FAI package contains and what separates a real one from a checkbox exercise.",
    "image": [
      "https://tekprecision.com/assets/inspection-station-Cb9Uo3Gs.webp"
    ],
    "datePublished": "2026-08-06",
    "dateModified": "2026-08-06",
    "mainEntityOfPage": {
      "@type": "WebPage",
      "@id": "https://tekprecision.com/blog/first-article-inspection-flight-critical-hardware"
    },
    "author": {
      "@id": "https://tekprecision.com/#organization"
    },
    "publisher": {
      "@id": "https://tekprecision.com/#organization"
    }
  },
  {
    "@context": "https://schema.org",
    "@type": "BreadcrumbList",
    "itemListElement": [
      {
        "@type": "ListItem",
        "position": 1,
        "name": "Home",
        "item": "https://tekprecision.com/"
      },
      {
        "@type": "ListItem",
        "position": 2,
        "name": "Blog",
        "item": "https://tekprecision.com/blog"
      },
      {
        "@type": "ListItem",
        "position": 3,
        "name": "First-Article Inspection: What Buyers Should Actually Expect",
        "item": "https://tekprecision.com/blog/first-article-inspection-flight-critical-hardware"
      }
    ]
  }
]
```